Drywall installation in Vancouver, from one room to a whole house
Vancouver Drywall Guys takes on drywall installation in Vancouver for new builds, basements, additions and gut renovations. Board hung with the joints planned, taped and finished to the level your job actually needs, primed and cleaned up. We ask about your permits and inspections at the quote stage, because boarding before an inspection passes is how walls come back off.
- Basements, renovations, additions and new builds
- Right board for each room, supplied and hung
- Sound-rated and moisture-resistant assemblies
- Fixed price with the finish level named
Get a fixed-price quote
Send us the details and we will get back to you with a written quote. No hourly guessing.
Thanks, we have your details
We read every request and reply with a written quote. If it is urgent, call604-227-4559and you will get one of us on the phone.
Open 7 days
8AM to 8PM, including weekends
Fixed-price quotes
Priced by the job, never by the hour
Same-day small repairs
Patches and holes often same or next day
We clean up
Debris and dust removal included
What we install
Drywall installation Vancouver homeowners and builders call us for
Residential and strata interiors, from a single wall that came out to a whole house of board. Priced by the job, finished paint-ready, debris gone.
Basement finishing
The most common job we quote in Vancouver, and the one with the most ways to go wrong. Board goes on after two inspections pass, not before, and we plan the date around that rather than around wishful thinking.
Gut renovations
Kitchens, bathrooms and whole floors stripped to studs. We come in after the rough-ins and the inspections, hang the right board for each room, and finish it paint-ready.
New construction and additions
Whole houses, laneway houses and additions. We work to the drawings and to the schedule of whoever is running the build, and we tell you early if the sequence in front of us will not work.
Single rooms
One bedroom, a home office, a garage conversion, a wall that came out. Small enough to price on the phone most of the time and small enough to fit into a week.
Ceilings
New ceilings, replaced ceilings, and ceilings after abatement. Sag-resistant board where the joists are spaced wide, because ordinary board over a wide span bellies between the framing within a couple of years.
Sound-rated and rated assemblies
Walls built to a tested assembly rather than assembled to look similar. Where a fire or sound rating is required, every component is part of what was tested, so we build the listed assembly from the drawings.
Vancouver rules
Why board cannot go up until two inspections pass
This moves more drywall start dates in Vancouver than weather, materials and crews combined. It is also the thing homeowners are told about last, usually by the inspector.
And the permit question, before you get that far
Finishing a basement in Vancouver needs a building permit as soon as framing, insulation, vapour barrier or drywall is involved. Paint, flooring and trim by themselves do not. Adding an interior partition needs one as well, even where the wall holds nothing up, because once it is closed in nobody can verify what went behind it.
In a multi-unit residential building there is a third case. The City lists drywall repairs to fire separations in the same category as structural repairs, so walls between units, corridor walls, ceilings between suites and shaft or service room walls are permit work.
We are not the permit authority and we will not pretend to be. What we will do is tell you which category we think you are in before we quote, so you find out from us rather than from an inspector standing in a finished room.
Materials
Which board belongs in which room
Regular board is right for most of a house and there is no reason to upgrade a dry bedroom wall. Five situations change the answer, and one of them is a mistake we see built into Vancouver bathrooms constantly.
In damp rooms, the upgrade worth paying for is a fibreglass-faced board rather than the old paper-faced green board. Mould eats paper, so taking the paper face away takes the food away. It adds around $0.30 to $0.80 per square foot, which is nothing against the cost of opening a bathroom wall back up in a climate this wet.
Here is the mistake: moisture-resistant board is not a tile backer. Inside a shower or a tub surround you need cement board or a purpose-made tile backer with a waterproofing membrane behind the tile. Green board in a shower is a five-year problem, and it is in a lot of bathrooms in this city.
On ceilings, sag-resistant board matters where joists are spaced wide, because ordinary board over a wide span bellies between the framing over time and you notice it from the doorway. And where drawings call for a fire or sound rating, the board is one component of a tested assembly rather than a product choice, which is covered below.
What an installation includes
- Board, tape, compound, screws and corner bead supplied
- Joints planned to fall where light and sightlines are least likely to find them
- Board type chosen per room and named in the quote
- Taping and three coats with proper dry time between each one
- Sanded to a paint-ready Level 4 unless you have asked for Level 5
- Surface primed so your paint does not flash over the compound
- Offcuts and dust removed, hauled to a facility that takes commercial gypsum
Finish painting is not included. We prime and hand over a surface your painter can start on the same day.
Sound
Soundproofing a wall, and the money people waste on it
If you want a wall quieter, this has to happen while it is open. It is also the area where the gap between what works and what gets sold is widest.
There are four mechanisms that reduce sound through a wall. Everything that works is one of these or a combination of them.
- 1
Mass
More weight in the wall, usually a second layer of board. Simple, effective, and the cheapest real improvement per dollar.
- 2
Decoupling
Stopping the two faces of the wall from sharing framing, using resilient channel or a double stud wall. The most effective single move and the most disruptive, since a double stud wall costs you floor space.
- 3
Damping
A viscoelastic compound sandwiched between two layers of board, which converts sound energy into a very small amount of heat. Punches above its weight at low frequencies, which is the bass and footfall people actually complain about.
- 4
Absorption
Insulation in the cavity. The cheapest step and always worth doing, but the weakest of the four on its own. Batts alone will not fix a party wall.
What it costs
What drywall installation in Vancouver costs
Published so you have something to check quotes against, ours included. Vancouver runs roughly 20 to 25 percent above the Canadian average on this work.
| Work | Typical range | What that covers |
|---|---|---|
| Hang and finish to Level 4 | $2.50 to $4.50 per sq ft | Board supplied and hung, taped, three coats, sanded and primed ready for paint. Priced on wall and ceiling surface area, not floor area. |
| Single room | $1,200 to $3,000 | A bedroom or home office, walls and ceiling, hung and finished. Ceiling height and how many openings there are move it within the range. |
| Basement, 1,000 sq ft floor area | $6,250 to $14,000 | That floor area is roughly 2,500 to 3,500 sq ft of actual surface once you count both faces of every partition plus the ceiling, which is why the number looks big next to the room size. |
| Level 5 skim coat upgrade | Add $1.50 to $3.00 per sq ft | A full skim over the whole surface on top of Level 4. Worth it under gloss paint, deep colours or raking light. Not worth it under flat paint in an ordinary room. |
| Sound-rated wall assembly | Add $2 to $5 per sq ft | Depends entirely on which assembly. A second layer of board with damping compound sits at the bottom, a decoupled double-stud wall at the top. |
| Moisture or mould-resistant board | Add $0.30 to $0.80 per sq ft | Fibreglass-faced board in bathrooms, laundries and basements. Cheap insurance in a climate like this one. |
Ranges are what this work generally costs in Vancouver in 2026, gathered from local cost data and our own jobs. They are a starting point for planning, not a quote. Access, ceiling height, the finish level you need and the state of what is already there all move the number, so we price every job after seeing it.
The process
How an installation with us runs
We take on drywall installation Vancouver-wide, seven days a week. No charge for the site visit or the quote, and no obligation once you have the number.
- 1
We look at the job and the drawings
For anything past a single room we come and see it. What we are working out is not just area, it is access, ceiling heights, which board each room needs, and whether the trades ahead of us have actually finished. That last one moves more start dates than anything else.
- 2
Fixed price, in writing, with the finish level named
One number for the job, with the finish level, the board types and debris removal spelled out. If a genuine unknown turns up behind a wall we stop and price it before continuing rather than adding it to the invoice at the end.
- 3
Hang, tape, coat, sand, prime, clean
Board goes on with joints planned to fall where they are least visible. Then taping and three coats with proper dry time between them, sanded, primed, and the offcuts and dust taken away. You get a surface a painter can work on.
Free advice
The order the trades should go in
We give this away on every quote, including jobs where somebody else runs the schedule. It costs us nothing and it saves clients real money.
- Step 1
Rough-ins
Plumbing, gas, electrical and mechanical, all complete. Then the framing inspection.
- Step 2
Insulation and vapour barrier
Installed fully, then inspected and approved. Nothing gets covered before this passes.
- Step 3
Drywall
Hung, taped, coated, sanded and primed. The dustiest stage of the entire build, by a wide margin.
- Step 4
Flooring
After the dust, not before. New floors installed ahead of drywall live through the worst of it.
- Step 5
Paint
Ceilings before walls. Painting before ceiling work means painting twice.
- Step 6
Trim and fixtures
Last, so nothing finished is in the way of anything messy.
Questions
Drywall installation questions we get asked
The ones that save money are the permit, sequencing and finish level questions. Worth ten minutes.
How much does drywall installation cost in Vancouver?
Board hung and finished to a paint-ready Level 4 generally runs $2.50 to $4.50 per square foot of wall and ceiling surface in Vancouver. A single room lands around $1,200 to $3,000, and a 1,000 square foot basement between $6,250 and $14,000.
The part that surprises people is not the rate, it is the area. Drywall is measured on surface, and surface runs roughly 2.5 to 3.5 times floor area once you count both faces of every partition plus the ceiling. So a 1,000 square foot basement is really 2,500 to 3,500 square feet of board. When a quote seems high against the size of the room, this is almost always the reason.
Vancouver also sits about 20 to 25 percent above the Canadian average on this work, so national cost calculators will under-quote you by a wide margin.
Do I need a permit to install drywall in Vancouver?
Replacing board in a room that already exists, inside your own house, does not need a permit. Two situations do, and both catch people out.
Finishing a basement needs a City of Vancouver building permit the moment framing, insulation, vapour barrier or drywall is involved. Paint, flooring and trim on their own are cosmetic and do not. Adding an interior partition needs a permit too, even where the wall carries no load, because once the wall is closed up an inspector cannot verify what went in behind it.
Separately, in a multi-unit residential building the City lists drywall repairs to fire separations as permit work, alongside structural repairs. If you are not sure which category you are in, the City's Development and Building Services Centre will tell you, and we will tell you what we think before we quote.
When can drywall go up on a permitted job?
After two inspections pass, and this is the single most common reason a drywall start date moves in Vancouver.
The framing inspection comes first. It happens before any insulation goes in, and only after the sheathing membrane and all the plumbing, gas, electrical and mechanical rough-ins are complete, with framing, beams, fire blocking and draft stopping all visible. Then the insulation and vapour barrier inspection, once framing has passed and the insulation and poly are fully installed. The City's own guidance is that interior wall and ceiling finishes should not start until that second inspection is approved.
The inspector is checking vapour barrier continuity, poly boots on the electrical boxes, sealed duct joints and insulation on sprinkler pipe. Every one of those things vanishes behind drywall. Board early and you may be taking the walls back off, so we would rather move your date by three days than do the job twice.
Which type of drywall do I need in each room?
Regular board is right for most walls and ceilings in a dry room and there is no reason to spend more. Where it changes: bathrooms, laundries, basements, ceilings with wide-spaced joists, and any wall carrying a fire or sound rating.
For damp rooms, the useful upgrade in Vancouver is a fibreglass-faced board rather than the old paper-faced green board. Paper is what mould eats, so removing the paper face removes the food. It adds roughly $0.30 to $0.80 per square foot, which is very cheap insurance in a coastal climate.
One thing worth being clear about: moisture-resistant board is not a tile backer. Inside a shower or a tub surround you want cement board or a proper tile backer board and a waterproofing membrane, not green board. Plenty of bathrooms in this city were built the wrong way round and the failure shows up five years later behind the tile.
Can you soundproof a wall while you are installing the drywall?
Yes, and doing it during installation is the only sensible time, because every effective method needs the wall open. But it is worth understanding what actually works, because this is the area where people waste the most money.
There are four mechanisms and only four. Mass, meaning more weight in the wall, usually a second layer of board. Decoupling, meaning the two faces of the wall do not touch the same framing, using resilient channel or a double stud wall. Damping, meaning a viscoelastic compound sandwiched between two layers of board that turns sound energy into a tiny amount of heat. And absorption, meaning insulation in the cavity. Insulation alone helps and is the cheapest step, but it is the weakest of the four on its own.
What does not work is anything you paint or hang on the finished surface. Soundproof paint does nothing measurable. Foam panels absorb echo inside a room, which is a completely different problem from stopping sound getting through a wall. And the whole assembly is only as good as its weakest path, so a solid wall with a hollow door or an unsealed outlet in it leaks straight through. We would rather do one wall properly than four walls half way, and we will say so.
How long does drywall installation take?
The hanging is fast. The finishing sets the schedule, because every coat of compound has to dry before the next one goes on.
A single room is realistically three to five days even though the hands-on work is a day or two. A basement runs two to four weeks for the drywall stage. Vancouver from October to March makes it slower: afternoon relative humidity averages 76 to 82 percent, compound needs at least about 12.8 degrees and moving air, and drying slows sharply as humidity climbs, so a coat can want 24 to 48 hours instead of overnight.
We manage that with heat and ventilation, and with setting-type compound where it makes sense, because it cures chemically rather than by evaporation and does not care much about the weather. What we will not do is rush coats. Compound that goes on over compound that is not dry is how you get cracked tape and lifting seams a year later.
Do you supply the drywall or do I buy it?
We supply it, and it is included in the quoted price along with tape, compound, screws, corner bead and disposal.
You are welcome to supply your own if you have a reason to, and occasionally people do because a builder has an account. Two things to know if you go that route. We will not warrant material we did not choose, and getting the count wrong is expensive in a different way, because a second delivery for four sheets costs more than the sheets.
Delivery access is the practical issue nobody thinks about. Board comes in large heavy sheets, and getting them into a laneway house, up to a third floor, or into a tower suite through a booked freight elevator needs planning before the delivery, not on the morning of it.
What finish level should I ask for?
Level 4 for almost every room. It is the normal paint-ready residential finish and it is what our quotes assume unless you tell us otherwise.
Level 5 adds a thin skim coat of compound across the entire surface, and it costs roughly $1.50 to $3.00 per square foot more. What forces it is not budget, it is light and sheen. The GA-214 standard calls for Level 5 with gloss, semi-gloss or enamel paint, with dark or deep tone paints, and under critical lighting, meaning light striking the surface at a shallow angle. In Vancouver that usually means a big window with low winter sun raking along a wall, or wall-washer and cove lighting.
Under flat paint in a room with ordinary windows, Level 5 is money you do not need to spend and we will tell you so. Where it does earn its keep is a feature wall in gloss, a dark accent colour, or a ceiling with pot lights washing across it.
Do you do the framing and insulation as well as the board?
We do steel stud framing, and we install batt insulation with the vapour barrier that goes with it. So on a basement or a partition job we can carry the framing, the insulation, the poly and the board as one scope.
That matters more than it sounds. When the insulation and vapour barrier inspection does not pass, and the insulator, the framer and the drywaller are three different companies, you get a week of everyone explaining why it is somebody else's problem. One crew means one person responsible for the wall passing.
What we do not do: load-bearing or structural framing, which needs a professional engineer, and spray foam or blown-in insulation, which is a different trade with different equipment. We will say so rather than taking it on.
Do you paint the drywall when you are finished?
We prime it. We do not quote finish painting, and that is deliberate rather than a gap.
Priming is the step that gets skipped and it matters. Bare joint compound is far more porous than the board around it, so it absorbs paint at a different rate and dries to a different sheen. That is flashing, and it is why a wall can look flawless right up until the moment it is painted. We prime so your painter starts from an even surface.
If you want the whole job under one contract, plenty of our clients have a painter they already use, and we are happy to coordinate the handover so the painter is not standing in a room that is still drying.
Can you install drywall in a condo or a concrete tower?
Yes, and it is regular work for us, including for strata councils and property managers. There are a few differences from a house worth planning for.
Concrete and masonry walls get steel furring channel rather than board fixed straight to the wall, which gives a flat plane and a cavity for services without fixing timber against damp concrete. Material handling is the other difference: sheets come up in a service elevator that has to be booked a day or two ahead, with common areas protected on the route.
The slowest part is usually approval rather than construction. Your strata will likely need to sign off in writing before anything starts, particularly where the work touches something the strata insures, and that realistically takes four to eight weeks. Start it early, and tell us the building when you call so we work to its rules from day one.
What order should the trades go in?
Rough-ins first, then insulation and vapour barrier, then drywall, then flooring, then paint and trim. Getting this wrong is one of the more expensive mistakes on a renovation and it happens constantly.
The specific traps: flooring before drywall means your new floor lives through the dustiest stage of the build, and drywall sanding is genuinely the messiest thing that will happen in that room. Painting before ceilings means painting twice. And booking your drywall start before the rough-in inspections have actually been called leaves you paying for a crew to stand around.
We will tell you what we think the sequence should be when we quote, even on jobs where somebody else is running the schedule. It costs us nothing and it saves the client real money.
Also available
Our other drywall services in Vancouver
Most jobs need more than one of these, and it is usually cheaper and faster to have one crew do the lot.
- 01
Drywall repair
Holes, cracks, water damage, popped nails and failed corner bead patched and blended so the repair disappears.
- Hole and dent patching
- Water damage repair
- 02
Drywall taping
Taping, mudding and sanding to the finish level your job actually needs, including Level 5 skim coat for critical lighting.
- Taping and mudding
- Level 4 finishing
- 03
Textured ceilings
Stipple and popcorn ceilings smoothed, repaired or re-textured, with straight answers about asbestos testing first.
- Textured ceiling removal
- Popcorn and stipple ceiling removal
- 04
Insulation installation
Batt and acoustic insulation in walls, ceilings and basements, installed with the drywall that covers it.
- Wall batt insulation
- Ceiling batt insulation
- 05
Steel stud framing
Light gauge steel partitions, bulkheads and fire-rated assemblies for commercial and residential interiors.
- Interior steel stud partitions
- Fire-rated wall assemblies
Planning a basement, reno or new build?
Call and we will talk through the sequence, the inspections and what the board should be in each room, then give you one fixed price for the lot.
7 days a week, 8AM to 8PM